First CDM projects in Serbia

First CDM projects in Serbia

In February 2012 the first CDM projects in Serbia were registered by the UNFCCC. Amongst the four registered projects are three large wind farms developed by Energy Changes. We are especially proud of the smooth and efficient validation and registration process, which made it possible to have the projects registered only 8 months after they were published for global stakeholder consultation.

Learn more about our Serbian projects in our project reference section.

CAR - ODS Destruction, Mexico

since 2011
CAR - ODS Destruction, Mexico
CAR - ODS Destruction, Mexico
CAR - ODS Destruction, Mexico
CAR - ODS Destruction, Mexico
Kunde: 
O.S.L. OEKOSERVICES Luxembourgh
Project type: 
U.S. Climate Action Reserve
Land: 
Mexico
Methodik: 
CAR, Article 5 Project Protocol
  • Consulting and guidance during the individual CAR project process steps
  • Elaboration of Monitoring and Operation Plan (MOP) – plan of the monitoring, controlling, recording and reporting activities of ODS collection, transport and final destruction in order to fulfil all procedural requirements of the CAR.
  • Optimization of the monitoring operations, data recording and management

The client´s joint venture “Ecofrigo” is operating a de-manufacturing plant of the end-of-life refrigeration appliances in Celaya, state Guanajuato, Mexico. Thanks to an advanced European technology the de-manufacturing process has been supplemented by the refrigeration gasses extraction step.The refrigeration gases, especially those used in the old appliances, are so called “freons” (chlorfluorcarbons). They have a strong adverse effect on the Earth´s ozone layer and therefore are named as the ozone depleting substance (ODS). Moreover, they are very potent greenhouse gases, too.

CDM - 10 MW PV Power Plant, Dubai, United Arab Emirates

2011
CDM - 10 MW PV Power Plant, Dubai, United Arab Emirates
Kunde: 
DEWA & DCCE
Project type: 
CDM small scale
Land: 
United Arab Emirates
Methodik: 
AMS I.D - Grid connected renewable electricity generation
  • Evaluating the feasibility of the small-scale CDM project
  • Elaboration of Project Design Document (PDD), including the Monitoring Plan
  • Calculation of the DEWA grid emission factor
  • Calculation of the project potential emissions reductions
  • Assistance during the project validation by the Designated Operating Entity (DOE)

The owner is the Dubai Electricity and Water Authority (DEWA), a Dubai Government-run company, responsible for power generation, water production, transmission and distribution of power and water in the Emirate of Dubai. DEWA operates 8 power plants with a total installed capacity of 7,361 MW and 7 desalination plants with an installed capacity of 1.5 million cubic metres of water per day. The project will develop a small scale photovoltaic power plant on a site located south-east of the city of Dubai, on a gravel plain surrounded by the sand dunes.

CDM - Dubai Solar Farms Programme of Activities, United Arab Emirates

2011
CDM - Dubai Solar Farms Programme of Activities, United Arab Emirates
Kunde: 
Dubai Electricity and Water Authority (DEWA) & Dubai Carbon Centre of Excellence (DCCE)
Project type: 
CDM small scale
Land: 
United Arab Emirates
Methodik: 
ACM 0002 - Grid connected electricity generation from renewable sources
  • Evaluating the feasibility of the small-scale CDM project
  • Elaboration of PoA Project Design Document (PoA-DD), including the Monitoring Plan
  • Elaboration of the generic CPA Project Design Document (CPA-DD) and the first  
  • Calculation of the DEWA grid emission factor
  • Calculation of the project potential emissions reductions
  • Assistance during the project validation by the Designated Operating Entity (DOE)

The project will create a background for development and higher employment of electricity generation from solar energy in the Emirate of Dubai via establishing the CDM Programme of Activities (PoA). PoA will include unlimited number of individual CDM project activities (CPAs) complying with the PoA eligibility criteria.The Coordinating/Managing Entity (CME) of the PoA is the Dubai Electricity and Water Authority (DEWA), a Dubai Government-run company, responsible for power generation, water production, transmission and distribution of power and water in the Emirate of Dubai.

CDM - Absorption Chiller in Dubal, Dubai, United Arab Emirates

2011
CDM - Absorption Chiller in Dubal, Dubai, United Arab Emirates
CDM - Absorption Chiller in Dubal, Dubai, United Arab Emirates
CDM - Absorption Chiller in Dubal, Dubai, United Arab Emirates
Kunde: 
Dubai Aluminium Company Ltd (Dubal) & Dubai Carbon Centre of Excellence (DCCE)
Project type: 
CDM small scale
Land: 
United Arab Emirates
Methodik: 
AMS II.C - Demand-side energy efficiency activities for specific technologies
  • Evaluating the feasibility of the small-scale CDM project
  • Elaboration of Project Design Document (PDD), including the Monitoring Plan
  • Calculation of the Dubal captive power plants emission factor
  • Calculation of the DEWA grid emission factor
  • Calculation of the project potential emissions reductions

The owner is the Dubai Aluminium Company Ltd (Dubal). It commenced operation in 1979. Currently the plant has capacity of more than 950,000 MT of aluminium per year. The plant is located in Dubai, part Jebel Ali, in the United Arab Emirates.The chillers are installed in almost every building within the aluminium plant to provide the cooling for the main production, supporting processes, maintenance and other buildings. Existing chillers use the vapour compression chiller (VCC) technology.

CDM - Energy Optimization in Desalination Plant in Dubal, Dubai, United Arab Emirates

2011
CDM - Energy Optimization in Desalination Plant in Dubal, Dubai, United Arab Emirates
CDM - Energy Optimization in Desalination Plant in Dubal, Dubai, United Arab Emirates
Kunde: 
Dubai Aluminium Company Ltd (Dubal) & Dubai Carbon Centre of Excellence (DCCE)
Project type: 
CDM small scale
Land: 
United Arab Emirates
Methodik: 
AMS II.C - Demand-side energy efficiency activities for specific technologies
  • Evaluating the feasibility of the small-scale CDM project 
  • Elaboration of Project Design Document (PDD), including the Monitoring Plan
  • Calculation of the Dubal captive power plants emission factor
  • Calculation of the DEWA grid emission factor
  • Calculation of the project potential emissions reductions

The owner is the Dubai Aluminium Company Ltd (Dubal). It commenced operation in 1979. Currently the plant has capacity of more than 950,000 MT of aluminium per year. The plant is located in Dubai, part Jebel Ali, in the United Arab Emirates.The desalination plant (DESAL) is part of DUBAL´s industrial aluminium production plant.

Small Hydro Power Plants in Albania and Serbia

Small Hydro Power Plants in Albania and Serbia

By uploading to the UNFCCC web site on May 15th 2012 the validation of the CDM Programme of Activities (=PoA) “Small Hydro Power Plants in Albania and Serbia” started. In cooperation with company denkstatt GmbH, Energy Changes is developing the carbon component for a couple of small hydro power plants in the Balkan region . The programme is financed by the International Finance Corporation (IFC) and the Coordinating entity of the CDM PoA is enso hydro GmbH.

Carbon Potential in Transportation

Carbon Potential in Transportation

EBRD initiates project with Austrian team of experts to work on the identification of Carbon Potential in Urban Transport Projects

CDM - Sao Hill Energy CHP 15MW, Tanzania

since 2009
CDM - Sao Hill Energy CHP 15MW, Tanzania
CDM - Sao Hill Energy CHP 15MW, Tanzania
CDM - Sao Hill Energy CHP 15MW, Tanzania
Kunde: 
Green Resources ASA, Norway
Project type: 
CDM small scale
Land: 
Tanzania
Methodik: 
AMS I.C

CDM project management, inkluding:

  • Project evaluation
  • PDD development
  • Support of Validation
  • Preparation of Monitoring

A 15MWel biomass CHP is being constructed on the grounds of the sawmill of Sao Hill Industries Ltd. in the Iringa region in Tanzania. The fuel for this CHP will be wood waste from the own production as well as waste from small sawmills in the region. The heat produced will be used for the drying of wood products, the electricity will cover the own demand and the surplus (approx. 10MW) will be fed into the Tanzanian electricity grid.

JI - Windpark Casimcea, Romania

since 2010
JI - Windpark Casimcea, Romania
Kunde: 
Verbund Renewable Power
Project type: 
JI
Land: 
Romania
Methodik: 
ACM0002

JI project development, including:

  • PIN, Letter of Endorsement
  • PDD drafting
  • Support of Determination
  • Letter of Approval
  • Development of the monitoring plan
  • Drafting of the monitoring report
  • Support of Verification

The wind farm Casimcea consists of 4 clusters of wind turbines located around the village Casimcea in eastern Romania. Once fully implemented, the 77 turbines with a total capacity of 201 MW will annually generate approximately 560 GWh of emission free electricity. This will replace electricity from fossil fuel based power plants in the Romanian grid and reduce up to 520,000 tons of CO2 emissions per year